Pre-engineered, modularized systems optimized for heavy industry, mining run-off, complex trade waste, and oilfield flowback recovery.
Ultra-high pressure (up to 160 bar) Disc Tube and Spacer Tube RO membrane systems built for severe fouling and saturated salinity streams.
Thermal MVR evaporation, crystallizer, and membrane pre-concentration configurations designed to eliminate liquid trade waste charges.
Energy-efficient concentration of hypersaline brines past hydraulic pressure boundaries, reducing thermal evaporator sizing by up to 50%.
Integrated oil-water separation, chemical softening, and refractory organics polishing for high-TDS resource sector fluid recycling.
How rising utility tariffs, the Environment Protection Act 2017, and localized water scarcity across Greater Melbourne necessitate modular OEM water reuse solutions.
In the State of Victoria, environmental compliance has transformed under the updated Environment Protection Act 2017 (which came into enforceable operation in mid-2021). The foundational tenet—the General Environmental Duty (GED)—requires any facility conducting commercial activities to proactively eliminate or minimize risks of harm to human health and the environment from pollution and waste, so far as reasonably practicable.
For industrial manufacturing zones such as Dandenong South, Altona, Campbellfield, Laverton North, and Truganina, trade waste discharge to water authorities—predominantly Greater Western Water, South East Water, and Yarra Valley Water—is subject to steep escalation in volumetric tariffs, mass-load surcharges on Total Dissolved Solids (TDS), Biochemical Oxygen Demand (BOD), and Chemical Oxygen Demand (COD). Discharge agreements enforce rigorous TDS cut-offs, rendering conventional raw sewage discharge economically punishing for food processors, chemical manufacturers, and pharmaceutical synthesis plants.
While Melbourne relies on the Wonthaggi Victorian Desalination Project to buffer its surface reservoir storages (Thomson, Upper Yarra) during cyclical drought, potable bulk water tariffs paid by non-residential high-volume consumers continue to rise. Industrial operators consuming more than 50,000 m³ annually face dual financial pressure: purchasing mains water at prime commercial rates and subsequently paying trade waste utility fees to discard effluent laden with salts, scale-forming ions, and organic residues.
Transitioning toward a closed-loop system through an OEM Water Reuse Factory integration enables on-site recovery of up to 90%–98% of process streams. This not only insulates Victorian plants against future municipal water restriction mandates, but also decouples operational expansion from municipal sewer capacity constraints.
Bridging Australian engineering requirements (AS/NZS 3000 electrical standards, AS 1210 pressure vessel codes) with precision Chinese fabrication speed and scale.
Historically, Zero Liquid Discharge relied purely on capital-heavy, power-hungry thermal multi-effect evaporators (MEE). Today's global industry demands "Membrane-Maximized ZLD", concentrating streams via high-pressure RO/DTRO to over 100,000 mg/L TDS before thermal polishing, reducing operating OPEX by 65%.
As an OEM water reuse manufacturer based in Shanghai, we leverage an end-to-end industrial ecosystem: precision robotic orbital welding of Duplex 2205/2507 stainless steel, in-house CNC pressure disc machining, and direct assembly of Siemens/Allen-Bradley PLC control architectures tailored for export markets.
Every containerized and skid-mounted plant completes a rigorous 100% Factory Acceptance Test (FAT) with simulated saline water loads before dispatch. Skids land at the Port of Melbourne ready for plug-in operation, drastically reducing expensive Victorian on-site engineering labor and commissioning cycles.
| Evaluation Parameter | Conventional Melbourne EPC Assembly | Tongjie OEM Modular Skid Direct Supply | Competitive Gain for Local Partners |
|---|---|---|---|
| Lead Time (Design to Delivery) | 36–48 Weeks (Fragmented sub-contractor sourcing) | 12–16 Weeks (Fully integrated Shanghai facility) | Up to 60% Faster Project Deployment |
| Fabrication CAPEX (AUD) | Substantial cost driven by local structural assembly & piping | Optimized factory batch-manufacturing direct pricing | 35% to 50% Capital Expenditure Savings |
| Pressure Vessel & Metallurgy | Frequently limited standard 316L, costly custom duplex upgrades | Standardized Super Duplex 2507, Titanium Gr.2, 1.4462 piping | Superior Corrosion Resistance in Hypersaline Brines |
| Electrical & SCADA Integration | Assembled on-site with variable multi-vendor protocols | Integrated AS/NZS 3000 compliant panels, remote cloud telemetry | Unmanned Automated Monitoring & Logging |
| Testing & Commissioning | Dry-tested; unpredictable wet commissioning on client site | Full hydraulic wet FAT testing under 100+ bar real pressure | Predictable Zero-Rework Site Start-Up |
Engineered for high-fouling, complex trade waste profiles found in Victoria’s premier manufacturing, recycling, and resource recovery hubs.
Altona remains an industrial heartland hosting chemical blending, surfactant processing, and plastic polymer manufacturing. Effluent streams here often carry high emulsified organics, aromatic hydrocarbons, and elevated chloride levels. Our DTRO Skid Systems utilize open-channel disc-tube geometry with unobstructed hydrodynamic cross-flow patterns, preventing spacer-induced biofouling and allowing deep volumetric concentration where spiral-wound RO membranes fail within weeks.
The southeastern industrial basin features Australia’s densest concentration of commercial food and beverage processing, dairy evaporation plants, and commercial breweries. High Clean-in-Place (CIP) chemical washdown events generate brine rich in sodium hydroxide, nitric acid residues, and organic starches. Integrating Osmosis-Assisted Reverse Osmosis (OA-RO) allows these facilities to recover up to 92% of wash water for secondary boiler feed or cooling towers, slashing trade waste bills.
In Melbourne’s north, electroplating, anodizing, and powder coating facilities generate hazardous wash streams containing heavy metals (nickel, hexavalent chromium, zinc) and high sulfate-chloride background salinity. Our ZLD Volume Reduction packages combine lime-soda/caustic softening, ultrafiltration pre-polishing, high-pressure membrane stages, and skid crystallizers, recovering pure demineralized rinse water and yielding dry salt cakes compliant with EPA Victoria landfill classification guidelines.
As Victoria transitions from brown coal generation towards hydrogen hubs, battery energy storage systems (BESS), and circular lithium-ion battery recycling, high-saline leachates and cooling blowdown present acute remediation challenges. Tongjie’s skid-mounted modular evaporators and mechanical degassing systems ensure critical resource recovery and prevent contaminated leachate ingress into pristine Victorian river catchments.
Precision-manufactured skids, physical degassing membrane units, containerized SWRO, and custom ODM water treatment assemblies.
Energy recovery-equipped containerized SWRO producing pure potable and process water from raw Bass Strait coastal seawater.
Tailored OEM branding, custom mechanical layouts, and control software engineering for Australian engineering contractors.
Dissolved gas removal to low ppb levels for boiler feed, pharmaceutical formulation, and semiconductor wet bench production.
Engineered for extreme brine concentration using low-energy membrane cascade architectures, surpassing standard RO osmotic limits.
Built to strict Australian client specifications: stainless steel frame fabrication, robotic weld integrity, and global valve componentry.
Heavy duty oil, suspended solids, and salt removal skid bringing re-injection water down to ≤5 mg/L oil and ≤1 mg/L suspended solids.
Continuous Electrodeionization systems producing ultrapure conductivity water (<0.1 μS/cm) for Victorian pharmaceutical and power facilities.
Factory-prefabricated inside 20ft/40ft high-cube insulated shipping containers with climate control and plug-and-play flange hookups.
A rigorous breakdown of process chemistry, membrane materials, and quality assurance checkpoints demanded by international EPC engineers.
Traditional spiral-wound elements utilize feed spacers (28 to 34 mil) prone to particulate entrapment and bio-fouling. Our DTRO modules incorporate octagonal fluid redirection plates and unrestricted open-channel architecture. With fluid velocities exceeding 0.3 m/s across the membrane cushion, boundary layer concentration polarization is minimized, permitting operation on waters with Silt Density Index (SDI) values > 5 and COD up to 1,500 mg/L.
Osmosis-Assisted Reverse Osmosis (OA-RO) utilizes a semi-permeable membrane that admits a tailored saline sweep stream on the permeate side. By diminishing the net trans-membrane osmotic pressure difference (Δπ), OA-RO enables hydraulic high-pressure pumps to concentrate brine streams up to 180,000–220,000 mg/L TDS without exceeding the 160-bar physical burst threshold of modern composite materials.
High chloride concentrations at elevated operating pressures create severe crevice and pitting corrosion risks. Tongjie strictly specifies UNS S32750 (Super Duplex 2507) and Grade 2 Titanium for all high-pressure manifolds, backed by third-party positive material identification (PMI) and dye-penetrant testing of all welded joints prior to hydrostatic certification.
Specific guidance on regulatory compliance, electrical compatibility, membrane longevity, and international logistics.
All export equipment slated for Australia is engineered to comply with AS/NZS 3000 (Wiring Rules). Control enclosures are equipped with Australian-certified RCDs, circuit protection, emergency stop circuits, and 415V/50Hz 3-phase motor configurations. We routinely build with Siemens S7-1500 or Rockwell Allen-Bradley PLCs featuring localized Ethernet/IP or Profinet connectivity for seamless integration into local SCADA infrastructures.
To provide a guaranteed mass balance and process projection, our engineering team requires a comprehensive water test report detailing: TDS, electrical conductivity, pH, cations (Ca, Mg, Na, K, Ba, Sr, Fe, Mn), anions (Cl, SO4, HCO3, CO3, NO3, F), reactive silica (SiO2), total suspended solids (TSS), turbidity, COD/BOD, and free oil/grease. Operational parameters like minimum and maximum feed water temperature and site footprint restrictions are also required.
Because our open-channel DTRO design features low hydraulic resistance and high shear velocity, the Clean-in-Place (CIP) cycle typically ranges between 14 to 30 days depending on organic loading, compared to 2 to 4 days for standard spiral wound elements under identical conditions. Membrane cushions deliver an operational life of 2 to 4 years and are individually replaceable without discarding the entire pressure vessel column, reducing OPEX.
On-site fabrication in Australia faces substantial labor rates, specialized certified welding shortages, and fragmented component sourcing delays. By manufacturing completely within our 38-patent-backed Shanghai facility, the entire process train—valves, pressure vessels, high-pressure pumps, instruments, and wiring—is hydrostatically tested under full design pressure. Units ship inside sea-freight containers directly to the Port of Melbourne, requiring only mechanical tie-ins and mains power connection on site.
Yes. In applications involving combined chemical trade waste or contaminated groundwater, we integrate advanced oxidation processes (AOP), specialized granular activated carbon or ion exchange pre-columns, and multi-barrier nanofiltration/reverse osmosis membranes that reject per- and polyfluoroalkyl substances (PFAS) down to undetectable levels, satisfying Victoria's GED risk-minimization mandates.
Share your facility's raw water quality profile, daily volumetric flow, and discharge targets. Our application engineering team will deliver a comprehensive mass-balance projection and skid specification within 48 hours.